Saturday, April 21, 2012

10 most powerful IaaS companies - in alphabetical order

10 most powerful IaaS companies



"We assembled this list with help from analysts at Cloud Technology Partners, Current Analysis, Enterprise Strategy Group, Gartner, IDC, and Neovise who watch the public cloud Infrastructure as a Service scene very closely. Each was asked to name the companies they believed have the most influence – whether that’s measured in market share, mind share, revenue, existing enterprise pull or underlying technology links – in the world of IaaS. They are listed here in alphabetical order."

Tuesday, April 10, 2012

Great Tool to Help You Configure the Size of your Vault Server

IBM Vault Sizing Guide - WikiHelp


IBM Vault Sizing Guide

    Welcome to the IBM Vault Sizing Guide.  Autodesk and IBM have worked together to help you save time and money by recommending suitable hardware configurations for your anticipated Autodesk Vault implementation.  This guide features consistent and reliable recommendations based on the latest IBM hardware in conjunction with the software environment variables that you enter.
    Each recommendation in this guide considers a number of parameters you provide based on your anticipated Autodesk Vault environment.  Input parameters include:
    •             Total number of users
    •             Percentage of simultaneous users
    •             Amortization period of server
    •             New Vault implementation vs. migration from an older version
    •             Total size & number of files

    Thursday, March 29, 2012

    BIM and Spec Software Continued - BSD's Speclink-e and Linkman-e



    This presentation by Beth Stroshane will provide you with an in depth look at Building System Design Speclink-e and Linkman-e from a user point of view.

    The presentation will include the following:
    - An overview of the features of the software.
    - A discussion of how the out of the box features can be used to help solve old and new challenges:
    - Coordination and terminology.
    - Tracking information for the 2030 Challenge for Products, Red list, Specification Status or many more.

    Come learn what one firm is doing and start thinking about how you might use the same features in the same way, or in completely different ways, to raise the bar and move your practice and the industry forward.

    Beth Stroshane is a Certified Construction Specifier who has worked with BIM specification systems on large complex architectural projects for the last 6 years with NBBJ and ZGF Architects. Prior to writing specifications, Beth achieved bachelor's degrees in structural engineering and construction management, and worked as a construction engineer for Mortenson Construction.

    Wednesday, March 14, 2012

    ESG Lab Report Validates Nasuni as a Superior Solution for Multi-Site Storage Access - MarketWatch

    ESG Lab Report Validates Nasuni as a Superior Solution for Multi-Site Storage Access - MarketWatch

     PRESS RELEASE
    March 13, 2012, 11:39 a.m. EDT

    ESG Lab Report Validates Nasuni as a Superior Solution for Multi-Site Storage Access

    Report Highlights Performance, Ease of Use, Ease of Deployment and Reliability; Nasuni Enables Enterprises to Eliminate Costly and Cumbersome WAN Optimization and Replication Schemes for Sharing Storage Access

    Friday, February 17, 2012

    Nasuni Migrates Terabytes of Customer Primary Storage Data Between Clouds Without Disrupting IT Operations – Press Releases – News

    Nasuni Migrates Terabytes of Customer Primary Storage Data Between Clouds Without Disrupting IT Operations – Press Releases – News


    A large energy services company recently consolidated all of its storage under Nasuni’s SLA backed service to take advantage of both the 100 percent availability guarantee and multi-site capabilities. Their data included files for finance, IT, account management and operations that needed to be migrated from legacy cloud providers to one of Nasuni’s preferred providers.

    “I never felt a glitch,” said the IT manager responsible for primary storage. “It was smoother than I’d have ever thought possible, and our users never knew the difference.”

    Nasuni moved all of the data from the original cloud provider to Amazon S3 using Amazon EC2 so as to avoid overloading the customer’s own network. Per Nasuni’s security model, all data was encrypted at all times; Nasuni never had any visibility into the data. The customer now has over 15 TB of data with Nasuni.

    “Now this truly is a ‘set it and forget it’ type of service,” said the IT manager. “In addition, thanks to Nasuni’s multi-site capability, our users and sister companies no longer need to use a VPN to get access to their data. Not only does this make data access more convenient for our remote users, but it also greatly improved data retrieval when compared to going through a VPN tunnel, as was the case before.”



    We use and resell this product - Nasuni click here if you want to evaluate it http://www.nasuni.com/partner/lrplot


    Wednesday, February 8, 2012

    Amazon's gateway to mainstream public cloud | Technology Spectator

    "It is hard to imagine Amazon becoming a hardware supplier in order to overcome this issue. Even if it did, the gateway would still have the second major disadvantage: supporting only Amazon S3. This is a problem because the other gateways offer a choice of back-end clouds, and so provide customers with a way to avoid cloud lock-in."

    Amazon's gateway to mainstream public cloud | Technology Spectator

    Thursday, January 26, 2012

    Construction Operations Building Information Exchange (COBie) | Whole Building Design Guide

    Construction Operations Building Information Exchange (COBie) | Whole Building Design Guide

    INTRODUCTION

    Today, most contracts require the handover of paper documentscontaining equipment lists, product data sheets, warranties, spare part lists, preventive maintenance schedules, and other information. This information is essential to support theoperations, maintenance, and the management of the facilities assets by the owner and/or property manager.

    "Normally it takes us 3 years to get as-builts after the financial closeout of a project. Now I can get a pre-built equipment list before the building even breaks ground? Outstanding!"
    – Deputy Director, Department of Public Works

    Gathering this information at the end of the job, today's standard practice, is expensive, since most of the information has to be recreated from information created earlier. COBie simplifies the work required to capture and record project handover data.

    The COBie approach is to enter the data as it is created during design, construction, and commissioning, see Figure 1. Designers provide floor, space, and equipment layouts. Contractors provide make, model, and serial numbers of installed equipment. Much of the data provided by contractors comes directly from product manufacturers who can also participate in COBie.